×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Monday
18
May 2026
weather symbol
Athens 20°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

500MW of electricity from Attica to Crete with the new large interconnection

The maximum power that each of the two cables can support was reached

Newsroom July 14 10:58

Δείτε περισσότερα άρθρα μας στα αποτελέσματα αναζήτησης

Add Protothema.gr on Google

 

A new technical milestone – described as the most important so far – in the operation of the Crete-Attica electrical interconnection was achieved on Saturday with the transfer of 500 MW of power from Attica to Crete.

According to relevant sources at ADMIE and its subsidiary Ariadne Interconnection, which is developing the project, the maximum power that each of the two high-voltage direct current (HVDC) cables can support was achieved with the electrical loads transferred through the new interconnection, as envisaged in the planning of the power transfer tests. The proper operation of the Conversion Station equipment under demanding heat wave conditions was also confirmed.

This was preceded at the end of June by the successful transfer of 320 MW of loads from Crete to Attica, in the context of which it was established that the electrical interconnection responds perfectly to the power flow in both directions.

>Related articles

Alexis Tsipras to announce his new party on May 26, according to his post

International Museum Day 2026: Free admission and exciting events at museums across Greece

New sell-off in markets after Trump’s threats toward Iran: Asian markets fall, oil rises, fears over inflation and pressure on stocks and bonds

“The largest electricity transmission project built to date in Greece, from this summer, contributes to the energy shielding of Crete, directly upgrading its tourist product,” the same sources stress, adding:

“In combination with the existing interconnection between Crete and the Peloponnese, the new interconnection, via Attica, will henceforth offer multiple social, economic and environmental benefits for the island’s residents as well as for the whole country.”

The electricity interconnection between Crete and Attica was implemented with co-financing from the YMEPEPAA Operational Programme (NSRF 2014-2020) and from the “Environment and Climate Change” of NSRF2021-2027 up to the amount of 535.5 million euros.

Ask me anything

Explore related questions

#crete#Crete-Attica electrical interconnection#economy#electricity#energy#greece
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Alexis Tsipras to announce his new party on May 26, according to his post

May 18, 2026

International Museum Day 2026: Free admission and exciting events at museums across Greece

May 18, 2026

New sell-off in markets after Trump’s threats toward Iran: Asian markets fall, oil rises, fears over inflation and pressure on stocks and bonds

May 18, 2026

Checks in 90 countries on deposits, POS systems, real estate, social media, and assets by the AADE for Greek tax evasion

May 18, 2026

Mitsotakis speaks about elections in 2027 (and means it) without internal party tensions, new ND secretary “locked in”

May 18, 2026

Erdogan is legislating even the maps of his imagination, fully adopting the concept of casus belli

May 17, 2026

Fire caused by a drone attack at the Barakah nuclear power plant in Abu Dhabi

May 17, 2026

Mitsotakis: Elections in 2027, only through a third New Democracy government term does the sure path to Greece 2030 pass (updated)

May 17, 2026
All News

> Greece

In reverence, the emotional deposition in Jerusalem, see photos & video

The Holy Temple of the Resurrection opened after many days due to the war between Israel and Iran

April 10, 2026

In the final stretch for the accreditation of joint master’s degrees: Aiming for their launch in the coming academic year

April 10, 2026

Schedule for Epitaph Procession today (10/4)

April 10, 2026

Perfect weather for Easter excursions, according to Tsatrafyllia’s forecast

April 10, 2026

Easter in Greece: The customs that continue in Greek tradition – From Nafpaktos to Corfu

April 10, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα