×
×
Monday
14
Apr 2025
weather symbol
Athens 16°C

> Calatrava

> Calatrava

€80 Million and 14 Months for the renovation of Calatrava – When will OAKA close down

On 12 February, the crews are expected to start work - 500 tons will weigh only the screws, while cables will be used that will reach a length of ten kilometres

Olympic Stadium locked down due to a structural integrity problem at the Calatrava roof

A problem was identified after a study by TAIPED - The issue is now being discussed at Maximos Palace