In summer the first 10 km of the BOAK in the Neapoli – Agios Nikolaos section is delivered
According to the design, the new section of the BOAK provides for the improvement and widening of the existing road network, with two lanes of traffic and LRT in each direction, on a divided roadway with a total width of 22.25 metres.
The plan for a triple bypass on Kifisos via Skaramagas to tackle Athens traffic
Grade-separated interchanges in Skaramagas, Schisto, and the Shipyards, combined with the completion of the Western Aigaleo Ring Road, are expected to bring “relief” to the…river — Athens ranks as the third most stressful city for driving in Europe
Hymettus Tunnel that has been waiting…47 years – First announced by Konstantinos Karamanlis
The tunnel that would connect the Hymettus ring road with Vouliagmenis Avenue is one of the longest-running and most discussed infrastructure projects in Attica. For decades it has remained stuck at the stage of “test excavations.” Today, however, the project is returning dynamically as a key solution to Athens’ traffic problem