×
×
Saturday
15
Aug 2026
weather symbol
Athens 27°C

> infrastructure

> infrastructure

Infrastructures: The extensions of the Attiki Odos and the Elefsina – Oinoi axis are on the table

The minister spoke of an increase in the Public Investment Program to 500 million from 320 million due to budgetary space

OSE: Swiss interest in the reactivation of the Peloponnese railway network

Swiss Ambassador and the President of OSE discussed the completion of a detailed feasibility study

OSE: The Greek railway company utilizes drones, cameras and optical fibers to safeguard its infrastructure

The use of drones is not unique to Greece as it's employed in other European networks facing similar challenges, resulting in reductions in theft

Thessaly’s damage restoration plan for rail, road and school infrastructure

The total cost of the project will exceed 3 billion euros, as Kyriakos Mitsotakis said - The PM, during his statement, also referred to the European dimension of funding through the Recovery Fund

Previous
Load more