×
×
Tuesday
16
Dec 2025
weather symbol
Athens 15°C

> Metro line 4

> Metro line 4

The “Niki” metro module has reached 20% of its route on Metro Line 4 – Video, photos from the “Veikou” construction site

AVAX today opened its gates at the Veikou construction site

Infrastructure Ministry on metro works in Katechaki: No safety issues, no errors in tunnel routing or excavation

Findings from Christos Dimas and Nikos Tachiaos after their on-site inspection at the construction site of Metro Line 4 near GNA

The “Kolonaki” station of the new Metro Line 4 is “running”

Line 4 starts from Katehaki and passing through Zografou, Kaesariani, Kolonaki, Exarchia, Evelpidon Courthouse and Kypseli, it reaches Galati and the Veikou Park