Staikouras: The two tunnel boring machines advance construction of line 4 of the Athens metro
The tunnel boring machine (TBM) “Niki,” starting from Alsos Veikou, has already excavated a 520-meter-long tunnel, while the TBM “Athena,” starting from Katechaki, has completed 2,050 meters of tunneling