×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Monday
16
Mar 2026
weather symbol
Athens 16°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

Ellinikon: Over 30 cranes at the project – How the houses and infrastructure projects are progressing (photos)

The developments in The Ellinikon will feature "smart" management systems with the appropriate infrastructures

Newsroom June 5 12:28

More than 30 cranes working at the Ellinikon construction site are currently visible from Poseidonos Avenue, Vouliagmenis Avenue, and the surrounding roads, with intensive work progressing across the entire development area, as well as the initial stages of constructing the residences along the coastal front. Meanwhile, following the completion of the soil decontamination project, the foundations have been laid for The Ellinikon Sports Park, the sports center of the new Ellinikon city, with the new sports facilities set to be delivered to the public in 2025.

The data is provided by Lamda Development as part of the updates on the progress of the major redevelopment project currently being implemented on the coastal front. This includes residential developments, infrastructure projects, and other works such as the country’s largest mall and the sports center.

Specifically, in the infrastructure segment, concerning the project to underground a portion of Poseidonos Avenue, “construction work on one of the most modern tunnels in Europe is progressing rapidly, with 80% of the excavations completed and 60% of the concreting done,” as highlighted. For the flood protection projects, particularly the Trachones stream, 95% of the excavations and 65% of the concreting work have been completed, while for the airport stream (formerly known as Evryalis), the demarcation work is in full progress. The work on the Trachones stream within the airport area will be completed in 2024, and the airport stream in 2025.

Residential Developments

Regarding residential developments, the first floors of the Riviera Tower and the Cove Residences, the low-rise residential complexes on the coastal front, are visible from Poseidonos Avenue, as noted. For the tallest residential seaside skyscraper in the Mediterranean, “many cranes are working daily, and a multitude of specialized engineers, designers, and technicians are bringing the completion of the building of 167 apartments closer, all of which have either been sold or have deposits placed for their purchase.”

The cranes working at The Cove Residences are also visible from Poseidonos Avenue, where construction work is in full swing. The new 115 residences of Ellinikon, designed by the architectural firms Bobotis+Bobotis Architects and ISV Architects, have already been sold or have deposits placed for their purchase.

Both the Riviera Tower and the Cove Residences will be completed within 2026.

See Also:

Germany considering deportations to Afghanistan after migrant stabbing attack

Regarding ‘The Cove Villas,’ the plots with seaside villas, the required demolitions have been completed, building permits have been issued for 12 plots, and the process of issuing building permits for an additional 7 plots is underway.

Additional Residential Developments

Construction has also begun on Little Athens, LAMDA’s modern residential and commercial development proposal. The initial work includes excavations for Park Rise, a 50-meter-tall, 12-floor building designed by the internationally renowned architectural firm Bjarke Ingels Group (BIG), comprising 88 luxury residences. The new neighborhood of Ellinikon will feature a total of 1,115 residences and 115 commercial spaces catering to daily needs. It will also include four new residential complexes: Pavilion Terraces and Promenade Heights by 314 Architecture Studio, Atrium Gardens by Deda & Architects, and Trinity Gardens by Tsolakis Architects. The residences in Little Athens, offering direct access to the sea and the park, are expected to be completed by the end of 2026, in line with the Phase A plan.

>Related articles

Hymettus Tunnel that has been waiting…47 years – First announced by Konstantinos Karamanlis

Over 145,000 people pack a tropical Lonsdale St. for the 38th Antipodes Festival (photos)

Supplementary investigation into company that transported the Tempi wreckage – 17 people called to provide explanations

The developments in The Ellinikon will feature “smart” management systems with appropriate infrastructure to provide services such as central control and scheduling of all household appliances, optimizing their operation based on residents’ needs and habits, and more. This is in addition to IoT infrastructure, AI analytics, fiber optic networks, and 5G.

Sports Facilities

The works for The Ellinikon Sports Park are also progressing: soccer fields, an open track, a throwing area, a swimming pool, basketball and tennis courts. Construction of the Elliniko Sports Center, which aims to become an “international sports landmark, serving athletes, clubs, and federations from around the world,” is advancing. So far, the foundation work for the athletes’ dormitory building and the new administration building of the football facility has been completed. The foundation work for the track’s spectator area and the earthworks for shaping the entire sports center are in full swing. The new sports facilities are scheduled to be delivered to the public in 2025.

Ask me anything

Explore related questions

#economy#ellinikon#greece#Hellinikon#investments#photos
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Hymettus Tunnel that has been waiting…47 years – First announced by Konstantinos Karamanlis

March 16, 2026

Over 145,000 people pack a tropical Lonsdale St. for the 38th Antipodes Festival (photos)

March 16, 2026

Supplementary investigation into company that transported the Tempi wreckage – 17 people called to provide explanations

March 16, 2026

Japan is the country of honour at this year’s TIF

March 16, 2026

Androulakis: Turnout exceeded all expectations, 174,813 voted to elect PASOK congress delegates

March 16, 2026

U.S. Treasury Secretary: The U.S. allows Iranian tankers to pass through the Strait of Hormuz to maintain global supply

March 16, 2026

Smallpox in sheep and goats: alert ahead of Easter, zero relaxation of measures and intensified inspections

March 16, 2026

The blockade in the Strait of Hormuz does not only affect oil: 30% increase in fertilizer prices, concern about food production

March 16, 2026
All News

> Culture

From today the iconic painting of Delacroix “Greece in the ruins of Messolonghi” is on display (Photos)

The arrival of the painting of Eugene Delacroix has a special historical and emotional weight, said Lina Mendoni - The painting will be hosted at the Xenokrateio Archaeological Museum of Messolonghi until November

March 14, 2026

The lost Alexandria on the Tigris founded by Alexander the Great discovered in Iraq: Its enormous size surprised archaeologists (photos)

March 14, 2026

Caroline myss in Athens for a two-day workshop

March 13, 2026

Deutsche Welle is collecting signatures for the rescue of the Greek programme, the official campaign runs until 16 April

March 13, 2026

“Obedient” women and “tough” men: Gen Z is turning back to…tradition, study shows

March 12, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα