×
×
Friday
28
Aug 2026
weather symbol
Athens 31°C

> waste

> waste

Metlen: Historic milestone with first waste combustion at the Protos ERF facility in the UK

METLEN acted as strategic contractor on the project, undertaking the engineering, equipment procurement and turnkey delivery on behalf of Encyclis, in cooperation with Standardkessel Baumgarte GmbH

A dumping ground at the deepest point of the Mediterranean off Pylos

A report by Stuttgarter Zeitung on underwater pollution at the deepest point of the Mediterranean, known as Calypso, reveals the scale of the problem and the difficulties in addressing it

Athens declared on red alert for drought on Friday – Patmos and Leros follow tomorrow

The official announcement from the Regulatory Authority for Waste, Energy, and Water regarding the two islands—and subsequently for Attica—is a matter of hours away — Water reserves in the Mornos reservoir are at historic lows

From landfill to recycling: The industry’s plan to tackle the waste crisis

In favor of energy recovery but with proper prioritization of the necessary steps - Bell from SEPAN for Attica in which 50% of the country's waste is produced

Load more