×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Thursday
15
Oct 2026
weather symbol
Athens 15°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by
> Greece

Nothing is working at the wastewater treatment plant in Patmos – Sewage flows into the sea, regional inspection finds

Authorities identify serious issues during inspection – Today, a team from the Public Health Directorate travels to the island – Plant operators admit that no treatment is taking place

Newsroom August 26 12:10

Δείτε περισσότερα άρθρα μας στα αποτελέσματα αναζήτησης

Add Protothema.gr on Google

A series of violations leading to water quality degradation in Patmos and direct discharge of untreated sewage into the sea were identified by officials from the South Aegean Regional Environmental Directorate at the island’s Wastewater Treatment Plant.

Shocking images reported by protothema.gr showed brown water running from household taps, along with strong odors reported by residents. This prompted a preliminary investigation ordered by the Dodecanese Prosecutor’s Office and a series of inspections by the relevant authorities. Following the Regional Environmental Directorate’s inspection, today a team from the Public Health Directorate will visit the island.

Inspection Findings

According to the report published by protothema.gr, almost nothing is functioning properly at the Patmos Wastewater Treatment Plant.

The report states that during the inspection of the Patmos Municipal Wastewater Treatment Facility, it was explicitly confirmed by the responsible operators present that for the past month and a half, no wastewater treatment has been conducted, resulting in untreated sewage being discharged into the sea.

Δεν λειτουργεί τίποτα στον Βιολογικό στην Πάτμο, τα λύματα πέφτουν στη θάλασσα - Η αυτοψία της Περιφέρειας
Δεν λειτουργεί τίποτα στον Βιολογικό στην Πάτμο, τα λύματα πέφτουν στη θάλασσα - Η αυτοψία της Περιφέρειας
Δεν λειτουργεί τίποτα στον Βιολογικό στην Πάτμο, τα λύματα πέφτουν στη θάλασσα - Η αυτοψία της Περιφέρειας
Δεν λειτουργεί τίποτα στον Βιολογικό στην Πάτμο, τα λύματα πέφτουν στη θάλασσα - Η αυτοψία της Περιφέρειας
Δεν λειτουργεί τίποτα στον Βιολογικό στην Πάτμο, τα λύματα πέφτουν στη θάλασσα - Η αυτοψία της Περιφέρειας
Δεν λειτουργεί τίποτα στον Βιολογικό στην Πάτμο, τα λύματα πέφτουν στη θάλασσα - Η αυτοψία της Περιφέρειας

The problem is attributed to the high salinity of the incoming sewage, which damages the treatment membranes. The high salinity occurs because the sewer network lies below sea level.

>Related articles

Mitsotakis in Larissa: Farmers to get tax-free diesel at the pump from 1 November

Marco Rubio arrives in Athens to a warm welcome from Greek Foreign Minister

Greece and Turkey clash over overlapping military exercises in the Aegean

At the same time, the plant’s submarine pipeline is out of service due to debris entering it, and no perimeter tree planting has been carried out around the facility.

The report notes:
“During inspection at pumping station YA1 in the ‘Chochlakas’ area, no odors causing environmental degradation were detected under Article 2 of Law 1650/86. Recommendations were made to the responsible operators to restore the full functionality of the facility according to approved environmental terms, repair the sewage transfer networks to prevent excessive salinity, restore the treatment membranes, and repair the submarine pipeline through which treated sewage is discharged into the sea.”

Summary of Key Omissions from the Report:

  • Pollution of the sewage recipient, as the facility is out of operation without prior notification to the relevant Environmental Authority, without corrective measures from the operators, and without a timeline for completion, violating condition 6.59 of the related environmental permit.
  • Failure to restore the landscape of the treatment plant area with plantings, violating condition 6.3 of the related environmental permit.

Ask me anything

Explore related questions

#Aegean#environment#Patmos#plant#sea#sewage#wastewater
> More Greece

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Zelensky: “I felt betrayed by Trump. If you’re in the middle, you have to stay in the middle”

October 14, 2026

NATO Scandal: Arrests in Norway, raids in Germany and Romania – Officials allegedly bribed and fake invoices submitted

October 14, 2026

Mitsotakis to call for lower energy prices and household support at European Council Summit

October 14, 2026

Le Pen and Mélenchon gain momentum ahead of France’s Presidential election

October 14, 2026

Mitsotakis: No country is immune to the global storm, and no national measure can counter an international crisis

October 14, 2026

‘Trump needs a lesson in international law,’ says Nobel Peace Prize winner

October 14, 2026

Tires worth their weight in Gold: The geopolitical game behind natural rubber

October 14, 2026

Mitsotakis in Larissa: Farmers to get tax-free diesel at the pump from 1 November

October 14, 2026
All News

> Greece

In reverence, the emotional deposition in Jerusalem, see photos & video

The Holy Temple of the Resurrection opened after many days due to the war between Israel and Iran

April 10, 2026

In the final stretch for the accreditation of joint master’s degrees: Aiming for their launch in the coming academic year

April 10, 2026

Schedule for Epitaph Procession today (10/4)

April 10, 2026

Perfect weather for Easter excursions, according to Tsatrafyllia’s forecast

April 10, 2026

Easter in Greece: The customs that continue in Greek tradition – From Nafpaktos to Corfu

April 10, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα