×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Friday
07
Aug 2026
weather symbol
Athens 27°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

TAP pipeline has entered its final stage of completion

The TAP pipeline will have a total length of 878 km

Newsroom December 28 03:31

Δείτε περισσότερα άρθρα μας στα αποτελέσματα αναζήτησης

Add Protothema.gr on Google

82.4% of the project for the construction of the TAP pipeline – which is expected to supply natural gas from Azerbaijan to Greece, Albania and Italy – has been completed, while 10% of the respective offshore part of the pipeline under the Adriatic Sea has been completed.

Every day, as the high-level executives of the consortium managing the project point out, hundreds of meters with the Right of Way are being cleaned and shaped, while the pipes are being connected, welded, placed in the trench and covered with soil according to the construction stages and the timetable of the project.

The TAP pipeline will have a total length of 878 km.

At its highest point, in Potom, Albania, the pipeline will reach 2,100 meters above sea level, cross nine mountain peaks over 500 meters above sea level and will “climb” over a 40% a steep slope, while the deepest part of the submarine section will be 820 meters in the Adriatic Sea.

>Related articles

Greece and eight other UN member states reject Russia’s claim that the Mechanism for Criminal Tribunals has ceased operations

How the tragedy happened in Malia: Mother drowned trying to save her friend as children cried for help

Analysis: Europe at a crossroads – Wars, wildfires, migration: Why the old continent seems unable to manage successive crises

The overall construction phase of the project is expected to be completed in the second half of 2019, as Italian Prime Minister Giuseppe Conte has given the green light for the completion of the TAP pipeline, expressing his support for the project after many months of negotiations and constant concern over the objections of the Italian side.

The aim, according to the consortium’s managing director, composed of BP (20%), SOCAR (20%), Snam (20%), Fluxys (19%), Enagás (16% 5%), is for 100% of the part of the pipeline passing through the Greek territory to have been completed within 2019.

Source: Nefeli Tzanetakou/balkaneu

Ask me anything

Explore related questions

#albania#economy#energy#greece#Natural Gas#oil#pipeline#Trans Adriatic Pipeline’s (TAP)
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Greece and eight other UN member states reject Russia’s claim that the Mechanism for Criminal Tribunals has ceased operations

August 6, 2026

How the tragedy happened in Malia: Mother drowned trying to save her friend as children cried for help

August 6, 2026

Analysis: Europe at a crossroads – Wars, wildfires, migration: Why the old continent seems unable to manage successive crises

August 6, 2026

Apollo to acquire easyJet in £5.7 billion deal backed by Stelios Haji-Ioannou family

August 6, 2026

Why I didn’t save the puppy: Researcher who documented the wolf pack adopting dog explains why he didn’t intervene

August 6, 2026

Over 90 specializations and 860 programs announced for Greece’s public higher vocational training schools in 2026–2027

August 6, 2026

EU Migration Commissioner: EU must use every tool at its disposal to work with Morocco

August 6, 2026

Before-and-after images reveal SpaceX rocket stage crash on the moon, captured by South Korean lunar orbiter

August 6, 2026
All News

> Greece

In reverence, the emotional deposition in Jerusalem, see photos & video

The Holy Temple of the Resurrection opened after many days due to the war between Israel and Iran

April 10, 2026

In the final stretch for the accreditation of joint master’s degrees: Aiming for their launch in the coming academic year

April 10, 2026

Schedule for Epitaph Procession today (10/4)

April 10, 2026

Perfect weather for Easter excursions, according to Tsatrafyllia’s forecast

April 10, 2026

Easter in Greece: The customs that continue in Greek tradition – From Nafpaktos to Corfu

April 10, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα