×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Monday
15
Dec 2025
weather symbol
Athens 10°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

Ellinikon: The 10+ 1 firsts of the project – From zero environmental footprint to the largest park and tallest skyscraper

It is the largest of its kind integrated tourist and entertainment complex in Europe and Greece - An investment of more than 1 billion euros, with 3,000 jobs

Newsroom December 30 08:37

 

With the floors of the Riviera Tower and not only, rising day by day at Ellinikon, another construction year is coming to a close for LAMDA Development. With work, as the company’s CEO Odysseas Athanasiou recently pointed out, proceeding as planned in the face of a difficult construction market.

But what are the firsts at domestic and international level, which the Ellinikon project has already achieved and still aspires to achieve with the progress of the works, according to what has been known and made public so far:

1. The first city in Greece with zero environmental footprint:The city’s energy needs will be covered by renewable energy sources. All residences without exception will be “smart” and green. Sensor networks, Internet of Things and Artificial Intelligence (AI) applications will use data, predicting building and infrastructure maintenance needs, detecting faults at an early stage, saving costs, energy and natural resources.

2. The first “15 minutes city” from the ground up in Europe and Greece: Residents and visitors will be able to live their daily lives with distances covered on foot or by bicycle within 15 minutes. This approach promotes healthy living and sustainable mobility.

3. The largest park in Greece (Ellinikon Park), one of the largest seaside parks in the world with an area of 2,000 hectares. Already delivered is The Ellinikon Experience Park, a sample of the new park, with over 3 million visitors. It will be the first park in Greece to be SITES certified, a certification for sustainable and resilient outdoor spaces.

4. The largest shopping complex in Greece and one of the largest in southern Europe: The Ellinikon Mall is 1.5 times larger than The Mall Athens, with 280 new generation stores of the most popular and up-and-coming Greek and international brands. The development will boost the local economy and create new jobs.

5. The tallest green residential skyscraper in the Mediterranean, 200 meters high. It aspires to be the new landmark of the new city. The new city has since turned 50,000 square meters, since the start of the construction of the new city.

6. The Visitor Center, the largest of its kind in the world: The Experience Center has already been delivered to the public, allowing visitors to discover in depth the great project of Ellinikon’s redevelopment and travel into the future, in a sustainable, smart and innovative city. This experience enhances public understanding and support for the project.

7. The European-level model building for people with disabilities: Completed in full as part of the Ellinikon redevelopment within one year. It consists of four model buildings, with a total area of 11,500 square meters, and was constructed in a tree-lined area of seven acres. The complex, a 15 million euro donation by LAMDA Development, is already the new home for four clubs, showing its commitment to accessibility and social responsibility.

8. The largest urban tree transplantation in Greece: Already about 3,000 trees, which were located within Ellinikon, have been protected, transplanted in special nurseries, preserved, and in due time will be returned back to Ellinikon. This process enhances the biodiversity of the area.

>Related articles

How “Albanian” was Georgios Kastriotis or Skanderbeg, what does the domed tomb at the Hilandar Monastery on Mount Athos hide?

See all the farmers’ demands to the government: They do not want OPEKEPE’s control to be transferred to AADE

Mitsotakis to farmers: Dialogue cannot take place with ultimatums – Roadblocks undermine your struggle – We are examining a new support package

9. The biggest bioclimatic change with simultaneous infrastructure shielding: The ratio until recently of 70% cement-30% green area is reversed, to 70% green cover, radically changing the bioclimate of the entire area. At the same time, the largest city foundation flood control and other infrastructure projects in the country are proceeding at a rapid pace, strengthening the resilience of the region to climate change events.

10. Building the largest alliance of Greek and foreign groups from each sector of economic activity to create the project: Something that Ulysses Athanasiou had pointed out at an unsuspected time long before the work began. The alliance is now strengthened year after year with the entry of strong international and domestic companies, as well as with the repatriation of human resources that left our country during the crisis, strengthening innovation and development.

Finally, the largest of its kind integrated tourist and entertainment complex in Europe and in Greece: An investment of more than one billion euros, with 3,000 jobs. It will be the only integrated tourist complex of its kind in Europe. It is being built within Ellinikon by GEK Terna and Hard Rock Hotel & Casino Athens. This development will offer new opportunities and will strengthen the tourism industry of the region.

Ask me anything

Explore related questions

#city#economy#ellinikon#greece#investment#project
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

How “Albanian” was Georgios Kastriotis or Skanderbeg, what does the domed tomb at the Hilandar Monastery on Mount Athos hide?

December 14, 2025

See all the farmers’ demands to the government: They do not want OPEKEPE’s control to be transferred to AADE

December 14, 2025

Mitsotakis to farmers: Dialogue cannot take place with ultimatums – Roadblocks undermine your struggle – We are examining a new support package

December 14, 2025

Shooting in Sydney: Gunfire by two unknown individuals at a Jewish celebration on a beach, reports of casualties (videos)

December 14, 2025

Shops are open today, the market is open during festive hours

December 14, 2025

Sunday Sports Broadcasts: Where to watch the tests of the Super League’s Big Four

December 14, 2025

Moments of terror at Brown University after the shootings: Police evacuated students who had hidden

December 14, 2025

The redevelopment of Ellinikon prioritizes the extension of the Metro toward Glyfada – New extensions to follow

December 14, 2025
All News

> Greece

See all the farmers’ demands to the government: They do not want OPEKEPE’s control to be transferred to AADE

Farmers are reacting to the cleanup of the subsidy mechanism through the transfer of OPEKEPE’s responsibilities to AADE, as decided by the government. Among other things, they are demanding minimum guaranteed prices and electricity at 7 cents, and they want the money that was stolen to be returned and distributed to the real beneficiaries

December 14, 2025

The redevelopment of Ellinikon prioritizes the extension of the Metro toward Glyfada – New extensions to follow

December 14, 2025

Farmers to submit their demands today after saying no to Monday’s meeting – Mitsotakis’ response expected

December 14, 2025

The 15 from Crete before the European Public Prosecutor’s Office over OPEKEPE subsidies: They arrived under draconian security measures

December 14, 2025

These are the farmers’ demands: They are escalating their mobilizations despite the government’s call for dialogue with the roads kept open

December 13, 2025
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2025 Πρώτο Θέμα