×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Friday
24
Jul 2026
weather symbol
Athens 24°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> World

Undersea power cable soldiers on despite WWII bombs

Unexploded bombs, mines, ordinances & downed aircraft are scattered at the bottom of the sea

Newsroom August 1 01:50

Δείτε περισσότερα άρθρα μας στα αποτελέσματα αναζήτησης

Add Protothema.gr on Google

A large-scale energy interconnector project linking the United Kingdom to mainland Europe is pressing on, despite the discovery of wartime bombs and mines in the cable’s path.

An energy project worth nearly €700m, which is intended to connect the UK’s national grid to power markets in Denmark and Norway, is having to contend with unexploded bombs, mines, ordinances and downed aircraft.

The Nemo Link, which began construction in late 2015, is nearly halfway complete and is due to come online in 2019. But its planned route crosses one of the world’s busiest shipping lanes and the venue for some of the most violent fighting during World War II: the Channel.

After surveys found dozens of wartime explosives on the seabed and floating in the water, the project’s backers called in the navies of Belgium, France and the UK in order to deal with the bombs and mines. This has mostly involved controlled explosions rather than removing the objects.

Nemo Link Project Director Mike Elmer told The Guardian that a 14th century ship found in French waters could have seriously delayed construction had it been discovered on the cable’s route, as it is now being treated as an archaeological find by the authorities.

He explained that “as soon as they designate [it] as archaeology, a 100-metre exclusion zone is put through the whole thing”.

The 80-mile interconnector will stay largely on course despite the deadly discoveries but will avoid parts of the wreckage of an aircraft, which could potentially be a war grave.

The UK currently has four interconnectors and eight more, including the Nemo Link, are in the works. Britain is currently increasing the amount of energy it generates from renewables and these undersea cables are an effective way of guaranteeing energy supply.

>Related articles

Eurostat: Greece leads Europe in public debt reduction

European prosecutors uncover €71 million VAT fraud ring with raids in Attica and Kastoria

IMF warns Europe: Public debt could surge to 130% of GDP by 2040 without action

Recently, the EU announced significant funding for an interconnector that will link France with Ireland and has been dubbed the ‘Brexit cable’, due to its target of reducing the Republic’s energy dependence on the UK.

Source

Ask me anything

Explore related questions

#britain#cable#downed aircraft#europe#mines#ordinances#power#undersea#Unexploded bombs#UXO
> More World

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Syros paramedic dies after stabbing at couple’s home

July 23, 2026

Newly opened E65 motorway answers where Recovery Fund money went, says Prime Minister

July 23, 2026

Trump warns he’s considering a “massive attack” on Iran, bigger than any before

July 23, 2026

Confessed killer of Stavros Georgiou taken before prosecutor

July 23, 2026

Prime Minister: New e-scooter rules put prevention and child safety first

July 23, 2026

Irish widow marks eight years since Mati wildfire tragedy that killed her husband days after their wedding

July 23, 2026

Hatzivasileiou in Vilnius: Preparations for Greece’s EU Presidency take centre stage

July 23, 2026

Venezuela earthquakes caused $19.6 billion in damage, World Bank says

July 23, 2026
All News

> Greece

In reverence, the emotional deposition in Jerusalem, see photos & video

The Holy Temple of the Resurrection opened after many days due to the war between Israel and Iran

April 10, 2026

In the final stretch for the accreditation of joint master’s degrees: Aiming for their launch in the coming academic year

April 10, 2026

Schedule for Epitaph Procession today (10/4)

April 10, 2026

Perfect weather for Easter excursions, according to Tsatrafyllia’s forecast

April 10, 2026

Easter in Greece: The customs that continue in Greek tradition – From Nafpaktos to Corfu

April 10, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα