×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Monday
18
May 2026
weather symbol
Athens 20°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

Electric trains to enter service on November 1st for Athens-Thessaloniki line

The railway will be this year's star in Thessaloniki International Fair

Newsroom September 3 10:42

Δείτε περισσότερα άρθρα μας στα αποτελέσματα αναζήτησης

Add Protothema.gr on Google

TRAINOSE’s electric trains will be able to cover the distance between Athens and Thessaloniki in 3 hours and 20 minutes by Summer 2019. According to well-informed sources of ypodomes.com, the two main factors that will lead to this major development are the completion of all construction projects on the main axis in the next two months and the completion of the signaling systems.

Now, Athens – Thessaloniki corridor has a double electrified line along its length, except for a 52 km long section, between Lianokladi and Domokos. Construction projects for the new double-track railway line are at a very advanced stage, problems with Railway Bridge 26 (as well as with other smaller ones) have been surpassed, and now the target is the completion of all pending works according to schedule.

This means that October 31st is the final date when AKTOR – TERNA – J&P AVAX J/V will have to deliver the project to ERGOSE and, in turn, to deliver the upgraded infrastructure to OSE which is the network operator.

According to the same sources, trial operation of all electrification, signaling and ETCS systems will have also been completed for the soon-to-be-released section of Lianokladi – Domokos, replacing the current obsolete single-track line.

Upon the last section’s delivery on November 1st, 2018, electric trains will be able to start for the first time from Piraeus Port to Thessaloniki without the need to change engines on the way. In theory, time distance between the two cities will be reduced to 3 hours and 30 minutes, but for safety reasons, this will not happen, at least until next Summer when all signaling systems will be in full operation, allowing speeds up to 200 km/h.

This project is being carried out by TOMH / Alstom J/V and will have been completed within 8-10 months. The contract regarding ECTS systems’ installation, which has started since 2007, and is being implemented by TERNA / Thales J/V is also under completion.

ETCS (European Train Control System) is ERTMS (European Rail Traffic Management System) equipment, installed both on lines and trains providing alerts on what is happening in front of the trains in order to prevent accidents and ensure the safety of the rolling stock, the tracks, the passengers and the freight.

With the projects’ completion in 2019 and the new speeds of up to 200 km/h on the upgraded corridor, the train will become fully competitive to intercity buses’ and airplanes’ services.

At the same time, by the end of the year, electrification and signaling systems’ installation will be completed on Polykastro – Idomeni section allowing international passenger services operated by electric trains to reach Thessaloniki in Northern Greece, while with the full integration of the new systems on the upgraded corridor, from Summer 2019 onwards, international services could reach Athens Central Railway Station for the very first time since its operation.

>Related articles

Polakis: I was and will always be SYRIZA, it’s a joke to be an independent MP

Kyriakos Mitsotakis at the General Assembly of the Association of Greek Tourism Enterprises (SETE)

Deviation from the EU over the non-recognition of the Pontic Genocide, says Nikitas Kaklamanis

The railway will be this year’s star in Thessaloniki International Fair. It is noteworthy that TRAINOSE has brought an Italian Pendolino train to the exhibition, which will be the country’s first high-speed train and will enter service in 2019.

GAIAOSE will bring its “pride”, an electric locomotive supporting speeds up to 200 km/h, while OSE is expected to bring to the fore the completion of the line, which along with the opening of the country’s railway market, will revive rail transport in our country after many years of decline.

Source: ypodomes

Ask me anything

Explore related questions

#economy#greece#infrastructure#line#train
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

The sister of Ireland’s president is among the Gaza activists arrested by Israel

May 18, 2026

Trump is threatening again: No concessions to Tehran – They know what will happen

May 18, 2026

Polakis: I was and will always be SYRIZA, it’s a joke to be an independent MP

May 18, 2026

Kyriakos Mitsotakis at the General Assembly of the Association of Greek Tourism Enterprises (SETE)

May 18, 2026

Taiwan excluded from the WHO Annual General Assembly at the request of China

May 18, 2026

Deviation from the EU over the non-recognition of the Pontic Genocide, says Nikitas Kaklamanis

May 18, 2026

Gradual reopening of the Strait of Hormuz with roles for Pakistan, Oman, and a “freeze” of the nuclear program: What Tehran is requesting in its revised proposal to the US

May 18, 2026

Eleni Avlonitou has left SYRIZA, heading to the Tsipras party

May 18, 2026
All News

> Greece

In reverence, the emotional deposition in Jerusalem, see photos & video

The Holy Temple of the Resurrection opened after many days due to the war between Israel and Iran

April 10, 2026

In the final stretch for the accreditation of joint master’s degrees: Aiming for their launch in the coming academic year

April 10, 2026

Schedule for Epitaph Procession today (10/4)

April 10, 2026

Perfect weather for Easter excursions, according to Tsatrafyllia’s forecast

April 10, 2026

Easter in Greece: The customs that continue in Greek tradition – From Nafpaktos to Corfu

April 10, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα